R/R04/000/0101 |
Safety |
- Awareness of legislation
- Awareness of company safety management system
- Knowledge of own role and responsibilities
- Basic understanding of regulations
- Understanding of company safety management system
- Identification of different areas in the workplace and the risks associated with each
|
- Locate all relevant health, safety and quality procedures at the worksite
- Participate in an offshore safety induction
- Follow safety instructions and use correct appropriate safety equipment for all deck and worksite operations
|
- Approved assessment by company official
- Logbook
|
R/R04/000/0202 |
Emergency response |
- Knowledge of emergency procedures
- Knowledge of the ROV team members’ roles and responsibilities
- Ability to describe own role in emergency situations and that of colleagues
|
- Read and demonstrated an understanding of company emergency procedure documents and where to find them
- Raise alarm and to alert others
|
- Approved assessment by company official
- Logbook
- Participation in drills
|
R/R04/000/0303 |
Communication and personnel skills |
- Knowledge and understanding of English permitting good oral and written communication
- Recognition of personal limitations and requests assistance from others when necessary without undue disruption and willing to offer assistance when needed
|
- Establish and maintain good working relationships with immediate team members
- Use of clear, concise and correct verbal communications with supervisor
- Work as part of a team and assist others
- Communicate with other team members
|
- Approved assessment by company official
- Logbook
|
R/R04/000/0404 |
Piloting an ROV (piloting/technical) |
- Describe the function of standard ROV controls and their use in navigating the ROV
- Understanding of use of sonar
- Awareness of changes in ranges/scales
- Understanding of use of acoustic positioning systems used by ROVs
|
- Navigating an ROV to work site in normal environmental conditions
- Familiarity with ROV controls
- Utilise navigational aids in order to direct and assist in piloting ROV
|
- Approved assessment by company official
- Logbook
|
R/R04/000/0505 |
ROV systems |
- Testing, maintenance and operation of ROV system under supervision
- Understanding of power up/power down safety sequence
|
- Assist with the completion of pre–dive checks of an ROV
- Assist with the launch of an ROV in normal environmental conditions
- Assist with completion of post dive checks of an ROV
- Identify all the main components of the ROV system and describe their functions, e.g. winch, A–frame/crane topside control components
- Assemble tools needed in change out including personal protective equipment
|
- Approved assessment by company official
- Logbook
|
R/R04/000/0606 |
Preventative maintenance |
- Awareness of requirements
- Assistance of colleagues when required with planned maintenance
|
- Describe why and when planned maintenance is needed
- Assist in preparing work area
- Determine what system isolations are required at the work area
- Determine relevant tools for work to be undertaken, under supervision
|
- Approved assessment by company official
- Logbook
|
R/R04/000/0707 |
Safe operating techniques |
- Understanding of safety and environmental requirements during launch and recovery and deck operations
|
- Describe correct/safe operation of launching system
- Describe roles of ROV team members during launch and recovery operations
- Describe environmental effect of and limitations to launch and recovery operations
|
- Approved assessment by company official
- Logbook
|
R/R04/000/0909 |
Administration |
- Understand importance of documentation and logs
- Knowledge of company QA and associated procedures
|
- Record ROV dive information onto dive logs
- Able to complete dive records – video, audio and written
- Record video information on to video tape in the required format
- Audio dub video material in real time utilising correct terminology and specified procedures
|
- Approved assessment by company official
- Logbook
|
R/R04/000/1111 |
Project activities |
- Understanding of project equipment operation procedures
|
- Familiarisation
- Project planning
- ROV dive planning
|
- Approved assessment by company official
- Logbook
|